Spatial development strategy
What the law asks, kept in order
A spatial development strategy has to contain certain things and follow a set path. This page holds them in one place and shows which are done, so nothing is found missing at examination.
Statutory checks
Each card is one requirement of the regulations and where it stands today.
- Regulation 4MetTitleThe title includes the words spatial development strategy.
- Regulation 5MetKey diagram9 of 9 policies shown on the diagram or applying to the whole area. Every symbol is explained in the key.Open the key diagram
- Regulations 6 to 12MetTimetableNext: the commencement notice, 15 March 2027.Open the timetable
- Framework PM1 and HO2In handHousing requirement for each council2 options kept, none marked as preferred.Open the apportionment
- Regulations 15 to 17In handConsultationOpen: 24 representations, 0 of 27 bodies notified. Summary of main issues approved.Open the consultation
- Framework PM14In handSoundness trail0 of 9 policies with nothing missing against the four tests. 32 gaps to close.Open the soundness trail
- Planning data standardMetPlan data and downloadsThe strategy and its timetable as open data in the shape of the approved standard, with reports to print and files for GIS.Open the downloads
- Regulation 20In handAnnual monitoring reportDue each year once the strategy is adopted; a draft can be read on any day. 5 of 9 policies have an indicator.Open the report
The strategy
County Spatial Development Strategy 2026 to 2047 (example draft)
Not yet adopted.
Regulation 4: the title must include the words spatial development strategy. The adoption date sets the day each annual monitoring report falls due (regulation 20).
Strategic policies (9)
The policies of strategic importance. Each is either shown on the key diagram or applies to the whole area.
SP1 · Spatial strategy
Growth at well connected towns
Most new homes and jobs go to towns with a railway station, and to previously developed land first.
On the key diagram2 indicatorsExample
SP2 · Homes
Homes for each council area
Housing need is shared between the council areas, with the arithmetic set out for examination.
Applies to the whole area5 indicatorsExample
SP3 · Jobs and centres
Town centres and employment hubs
Jobs, shops and services are directed to the main centres, so new residents can reach work without a car.
On the key diagram1 indicatorExample
SP4 · Transport
Movement corridors
Public transport, walking and cycling are improved first along the corridors that link the growth locations.
On the key diagramNo indicatorExample
SP5 · Environment
Green Belt and protected landscapes
The Green Belt and the National Landscape keep their protection; change there is by exception and evidenced.
On the key diagramNo indicatorExample
SP6 · Environment
Flood risk and water
Growth is steered away from land at risk of flooding, and water supply and treatment are planned with it.
On the key diagramNo indicatorExample
SP7 · Environment
Nature recovery
Corridors for wildlife link the protected places, in step with the local nature recovery strategy.
On the key diagramNo indicatorExample
SP8 · Climate
Net zero and a changing climate
Every growth location is tested for the carbon it adds and for heat, drought and flood to come.
Applies to the whole area1 indicatorExample
SP9 · Infrastructure
Infrastructure with the homes
Schools, health and transport are funded and timed with the homes they serve, in the order the investment ranking sets out.
On the key diagram2 indicatorsExample
Rules: Part 1A of the Planning and Compulsory Purchase Act 2004 (added by the Planning and Infrastructure Act 2025) and the Strategic Planning Authorities (Spatial Development Strategy) Regulations 2026, S.I. 2026/1162, in force from 26 November 2026. The policies shown as examples are not any authority's policies; they show how the platform holds a strategy.