Spatial Planning Platform

Monitoring

Are homes being built?

Homes added each year against the homes needed, the planning decisions that lead to them, and the land supply for the next five years.

Homes a year, last five years
4,213
38% of the 10,981 homes needed each year.
Wide gap to need
Homes added in 2025-26
3,162
The most recent year published. Recent figures are provisional and may be revised.
Homes on brownfield registers
28,636
On 1,109 sites. 17,817 of these homes are on sites with planning permission.

The county, year by year

Net additional dwellings for the whole county. The dashed line is the yearly need under the standard method.

05,00010,00015,0002011-122013-142015-162017-182019-202021-222023-242025-26Need per year: 10,981

District by district

The five year average is set against the yearly need under the standard method published in December 2024, which raised the figure for most areas: meeting need from 95%, gap to need from 75%, wide gap under that. The thresholds are settings.

District or boroughHomes in 2025-26Five year averageNeed per yearLast ten yearsStatus
Elmbridge24543128%1,562Wide gap to need
Epsom and Ewell3714416%889Wide gap to need
Guildford36659951%1,170Wide gap to need
Mole Valley21923829%833Wide gap to need
Reigate and Banstead23247136%1,306Wide gap to need
Runnymede65749779%626Gap to need
Spelthorne47628736%793Wide gap to need
Surrey Heath27631045%684Wide gap to need
Tandridge18022827%843Wide gap to need
Waverley33366945%1,481Wide gap to need
Woking14133943%794Wide gap to need

Planning permissions for homes

Applications for homes granted by each council over the last four quarters, July 2025 to June 2026. Major means 10 homes or more, minor 1 to 9. The figures count applications, not homes.

District or boroughMajor grantedMinor grantedShare grantedGranted, last three years
Elmbridge9of 14 decided197of 256 decided76%
Epsom and Ewell6of 8 decided36of 61 decided61%
Guildford3of 4 decided118of 149 decided79%
Mole Valley6of 8 decided60of 118 decided52%
Reigate and Banstead10of 12 decided68of 100 decided70%
Runnymede9of 11 decided50of 77 decided67%
Spelthorne4of 7 decided36of 61 decided59%
Surrey Heath5of 6 decided29of 42 decided71%
Tandridge7of 16 decided84of 131 decided62%
Waverley13of 18 decided115of 162 decided71%
Woking0of 0 decided25of 40 decided63%
Whole county7281868%

Five year land supply

What the Framework asks for in Annex D: five years of the yearly need, plus a buffer of 5%, or 20% where the Housing Delivery Test is below 85%. The supply side counts homes on the brownfield registers that the Framework treats as deliverable. The registers are only part of the supply, so the share covered is a floor.

Load a council trajectory
District or boroughDelivery test 2025BufferFive years with bufferDeliverable on registersNeeds evidencePermission to checkCouncil trajectory
Elmbridge59%Presumption applies20%9,372971% of the requirement497406Not loaded
Epsom and Ewell33%Presumption applies20%5,33400% of the requirement2250Not loaded
Guildford102%No action5%6,1431,66127% of the requirement253667Not loaded
Mole Valley72%Presumption applies20%4,99800% of the requirement30825Not loaded
Reigate and Banstead102%No action5%6,857831% of the requirement70454Not loaded
Runnymede94%Action plan5%3,28737711% of the requirement2,2543,199Not loaded
Spelthorne33%Presumption applies20%4,75800% of the requirementNo home numbers on the register00Not loaded
Surrey Heath98%No action5%3,59160% of the requirement1,1962,666Not loaded
Tandridge38%Presumption applies20%5,05800% of the requirement1031,627Not loaded
Waverley117%No action5%7,775661% of the requirement8313,263Not loaded
Woking97%No action5%4,16900% of the requirement5561,564Not loaded
Whole countyMeasured for each council61,3402,2904% of the requirement6,64914,2710 of 11 loaded

How sites are counted

  • Deliverable: detailed permission, or any permission for fewer than 10 homes, granted in the last three years or already started.
  • Needs evidence: outline permission for 10 homes or more, permission in principle, and sites the council marks as deliverable without permission. These count only with clear evidence that homes will come in five years.
  • Permission to check: granted more than three years ago or undated. It may have lapsed, or the homes may already be built.

The brownfield registers are only part of the supply. Greenfield permissions, allocations and small site windfalls sit in each council's own housing trajectory. Where a council's trajectory is loaded, its years of supply are shown; elsewhere the share covered by the registers is a floor, not the council's figure.

Land already identified

Sites on the brownfield land registers kept by the councils, with their minimum net dwellings. Some registers give no figure for a site; those count as zero.

District or boroughSitesHectaresHomes (minimum)With permission
Elmbridge2041042,143930
Epsom and Ewell2981,1380
Guildford44803,1762,328
Mole Valley57471,070825
Reigate and Banstead79301,392458
Runnymede2042415,8303,576
Spelthorne572300
Surrey Heath1151264,5642,842
Tandridge1771441,8601,627
Waverley862944,4883,667
Woking57582,9751,564
Whole county1,1091,15628,63617,817

Sources: Ministry of Housing, Communities and Local Government, live table 122 (net additional dwellings), indicative local housing need (December 2024), Housing Delivery Test 2025 measurement and district planning application statistics (PS2); brownfield land registers from the Planning Data platform.